Topics getting the most attention in Fort Smith public meetings, ranked by how frequently they come up.

15 issues (filtered)15 topics
MediumRoads

Roadway engineering update

Ben Marts, the interim deputy director of engineering for roadways, is lined up as guest speaker. Expect talk about street conditions, project priorities and the roadwork pipeline.

1 mention (1 this month)Last discussed Nov 9, 2026
MediumRoads

In-house street paving crew proposal

Public Works wants to build two internal paving crews — 23 personnel and $12-13 million up front in 2027 — claiming roughly 56% savings versus contracting out. Directors balked, saying they need the full numbers before approving it in the CIP.

1 mention (1 this month)Last discussed Oct 27, 2026
MediumRoads

2027 Sidewalk Program

Public Works proposes 3.21 miles of new sidewalks and 1.04 miles of repairs in 2027, prioritized by school proximity and pedestrian traffic, with a homebuilder offering to pay material costs on two stretches.

1 mention (1 this month)Last discussed Oct 27, 2026
MediumRoads

Street overlays and water plant maintenance

A $1.5 million street resurfacing contract and a $919,000 lagoon-cleaning contract were on the consent agenda — routine work that keeps roads smooth and water plants running.

1 mentionLast discussed Sep 1, 2026
LowRoads

Bobby Crabtree Boulevard Designation

A stretch of Towson Avenue would be renamed in honor of Bobby Crabtree.

2 mentionsLast discussed Sep 1, 2026
LowRoads

Spradling Avenue Extension Phase 2 engineering

An $83,230 contract amendment with Hawkins-Weir Engineers moves the Spradling Avenue Extension Phase 2 road project into final design.

1 mentionLast discussed Jul 21, 2026
HighRoads

ARDOT Transportation Projects Presentation

The state is planning to widen Rogers Avenue (Highway 22) from Waldron Avenue to 74th Street, and the city has to move its water and sewer lines out of the right-of-way first. The board considered asking for up to $20 million in federal help, though a local match of up to 25% could apply.

2 mentionsLast discussed Jul 13, 2026
HighRoads

Street overlay in-house plan

A $2.87 million contract with Forsgren Inc. for the 2024 Street Overlays/Reconstruction, Phase A, would repave and rebuild streets paid for by the voter-approved sales tax.

3 mentionsLast discussed Jun 26, 2026
HighRoads

Riverfront Gateway Project

The archway project near the Farmers Market needs design work and state highway department sign-off before it can get into the 2027 city budget — and the window to ask is February. The board named Josh Robertson as point person.

5 mentionsLast discussed Jun 18, 2026
MediumRoads

2026 Master Street Plan Engineering Contract

The city planned to hire Halff Associates for $273,000 to provide engineering services for the 2026 Master Street Plan.

1 mentionLast discussed Jun 16, 2026
MediumRoads

Post-meter downtown parking complaints

Since the parking meters were removed, businesses complain that employees are filling on-street spaces on Garrison, squeezing out customers. Police are promoting the $40/month city parking garage and asking the city board to keep addressing the issue.

1 mentionLast discussed May 21, 2026
HighRoads

Transit Department Update

The city was set to renew the franchise of Non-Ambulatory Transportation Service for five more years, keeping specialized rides for elderly and disabled residents through 2031.

3 mentionsLast discussed May 11, 2026
HighRoads

Street Overlays and Reconstruction

A $2.87 million contract with Forsgren Inc. for the 2024 Street Overlays/Reconstruction, Phase A, would repave and rebuild streets paid for by the voter-approved sales tax.

1 mentionLast discussed Apr 7, 2026
HighRoads

Rogers Avenue utility relocation ahead of ARDOT Highway 22 widening

The state is planning to widen Rogers Avenue (Highway 22) from Waldron Avenue to 74th Street, and the city has to move its water and sewer lines out of the right-of-way first. The board considered asking for up to $20 million in federal help, though a local match of up to 25% could apply.

1 mentionLast discussed Mar 31, 2026
MediumRoads

South 6th Street and Wheeler Avenue modifications

The Bakery District-requested project will realign South 6th Street for safer parking, add traffic calming, replace an old water line, and resurface the street. Crafton Tull is handling design through construction for a $226,245 engineering fee.

1 mentionLast discussed Mar 10, 2026